Back to Projects

Royal Children's
Hospital Melbourne

Location

Melbourne, Australia

Sector

Healthcare

Services

Engineering, BIM Coordination

Project Overview

AJ Design Group delivered critical engineering and BIM coordination services for the Royal Children's Hospital expansion project in Melbourne.

The Victorian Government's $56.4 million investment expanded the hospital's capacity through a two-stage development, adding vital inpatient ward and emergency department facilities.

Our team provided comprehensive technical coordination and engineering design to support the delivery of these essential healthcare facilities while the hospital remained fully operational.

$56.4M
Investment
30
New Beds
20
ED Treatment Spaces
15,730
Extra Patients/Year

Our Role

Healthcare Engineering

Designed and coordinated complex hydraulic and mechanical systems for the new 30-bed inpatient ward on level five. Our engineering solutions met stringent healthcare standards while supporting the hospital's operational requirements and patient care objectives.

BIM Coordination

Utilized advanced BIM modeling to coordinate building services across both expansion stages. Our 3D coordination minimized clashes and ensured seamless integration with existing hospital infrastructure, critical for maintaining continuous operations during construction.

Compliance & Documentation

Delivered comprehensive shop drawings and technical documentation ensuring full compliance with Australian healthcare regulations and NCC requirements. Our detailed as-built documentation supports ongoing facility management and future expansion planning.

Project Highlights

Operational Continuity

Construction completed while hospital remained fully operational, requiring careful coordination and phasing

Increased Capacity

33% expansion of emergency department capacity treating 13,000+ additional children annually

Partnership Delivery

Delivered in partnership with Kane Constructions under the Victorian Health Building Authority

Staged Completion

Two-stage delivery allowing early commissioning of inpatient ward while ED expansion continued