MPI PHEC facility under construction in Mt Albert, Auckland, July 2026
Back to Projects

MPI PHEC Facility

Location

Auckland, New Zealand

Sector

Science & Research

Services

Hydraulic BIM, Coordination, Shop Drawings

Status

In delivery

Construction photo: Crown Infrastructure Delivery, July 2026

Project Overview

The Ministry for Primary Industries' Plant Health and Environment Capability (PHEC) facility is under construction in Mt Albert, Auckland, supporting New Zealand's ability to detect, diagnose and respond to plant pests and diseases.

AJ Design Group provides hydraulic BIM modelling, services coordination and shop drawings for the hydraulic contractor. The construction documentation covers water supply, sanitary drainage, stormwater and structural penetrations across the laboratory, headhouse, greenhouse and associated service areas.

The project remains in delivery. Construction-stage modelling and drawing packages have been produced, with as-built documentation and asset information forming part of the handover scope.

Our Role

Hydraulic BIM and Coordination

AJ Design Group develops the hydraulic construction model in Revit, coordinating pipework, plant and equipment with structure and other building services.

Shop Drawings and Penetrations

The drawing package includes water, drainage and stormwater layouts, schematics, penetration setouts and reflected ceiling plans. Seismic restraint modelling and coordination support the installation documentation.

As-Builts and Asset Information

AJ Design Group's scope includes as-built model and drawing updates and hydraulic asset information.

Gallery

Interior construction and stair structure at the MPI PHEC facility, July 2026
Structural frame and interior construction at the MPI PHEC facility, July 2026
Aerial view of the MPI PHEC construction site in Mt Albert, July 2026

Construction photographs: Crown Infrastructure Delivery, July 2026.